Under Implementation Projects




Address : Unit 4 , NO37, Ali akbar (NO 12), Saadat abad St , Tehran , Iran Tel-Fax : 22149251 ، 22149259 , 22149267

General Visit: 141546 Today Visit: 33 Online Users : 1

Machineries

-1 moving wheeled tower crane  one unit
-2 405 Peugeot two unit
-3 Peykan pickup three unit
-4 Nissan pickup one unit
-5 Generator Diesel- KVA 150 two unit
-6 10 tone camion crane  one unit
-7 complete planet batching one unit
-8 120 tone cement burrow two unit
-9 2 tone dumper 3-sided one unit
-10 ceiling block device with a vibration table and 2000 washers one unit
-11 egg laying wall block device one unit
-12 4-wheeled electrical armature of cutting and bending one unit
-12 electrical bender device  one unit
-13 500 liter Concrete Mixer one unit
-14 electrical elevator four unit
-15 12 meter Conex 11 unit
-16 24 meter dormitory Conex one unit
-17 WC Conex one unit
-18 Guard Conex one unit
-19 20 feet container two unit
-20 water tank of 18500 liter capacity one unit
-21 Surveying camera of total station TS-02 one unit
-22 Surveying camera of Nuevo two unit
-23 concrete bucket  with 500 liter capacity one unit
-24 compactor two unit
-25 gasoline vibrator three unit
-26 wind compressor one unit
-27 destruction jackhammer two unit
-28 Four-purposed Hilti Drill four unit
-29 metal scaffold and fastener more than 1400 wing
-30 modular scaffold about 530 wing
-31 metal case 1000  square meter
-32 woody case 1000 square meter
-33 ceiling jack 400 units
-34 boiling rectifier three unit
-35 water pump three unit
-36 boiling transfer of 350 three unit
-37 freeze device 3000 four unit
-38 air cutting device with capsule three units